the office

Cooperative Bank of Thessaly

The artificial lighting of the building is based on the use of led lamps 4000 K (daylight), for maximum energy saving, visual comfort and optimum color performance and texture of the materials. Respectively, the external lighting of the building is implemented by waterproof led lamps fully embedded to the architectural elements of the building in order to enhance the plasticity of the shell during the night. All images courtesy of ARSIS Architects. Used under permission.

Architectural study: ARSIS Architects
Construction contractor: SOLIS S.A.
Photos: K. Katsianis